Working on my double dovetail MKI
Finally getting some play time and work done on my Bren double dovetail MK1. I opted to grab a BRP center section which cuts down the built time ( for me) quite a bit. Cut the gas cylinder section to length and milled both the center section and cylinder and welded them together.
Rear receiver heel was cut a little wide and thru the take down hole. Its welded and needs cosmetic clean up but I focused on the internal section.
The bolt and carrier do the "tilt test" and travel freely by its own weight. I built my DPM and RPD the same and they run super smooth.
The Slick Bren MKI restoration. - YouTube
---------- Post added at 10:57 PM ---------- Previous post was at 10:51 PM ----------
Some repair work in process~
https://i.imgur.com/mTIV5xH.jpg
https://i.imgur.com/tECO8NT.jpg
https://i.imgur.com/aqVWyBG.jpg
https://i.imgur.com/0YbkYEt.jpg
https://i.imgur.com/zaPDM0z.jpg
https://i.imgur.com/9Rx3R0y.jpg
https://i.imgur.com/Rwzs0Jb.jpg
https://i.imgur.com/pSJH4SS.jpg
https://i.imgur.com/EK4fg6j.jpg