Quote Originally Posted by bradtx View Post
breakeyp, With multiple assembly lines it's my guess each line had it's assigned S/N range. When a line's allotment was completed they would recieve another. breugal's old spreadsheet is what led me to think (perhaps incorrectly) along these lines.

Brad
I think it was the same story with the cross-over in No4 Mk1 & Mk2 production. They had thousands of rifles being shunted around various assembly stations on wheeled dollies. Its not hard to imagine that one or other line might close for a while, or that batches get out of sequence or sit awaiting parts (especially Mk1/Mk2) whilst the rest of production moves on.