07-14-2009 09:44 PM
# ADS
Friends and Sponsors
-
FREE MEMBER
NO Posting or PM's Allowed
Ouch! Somebody is going to have to contact the insurance company. Sincerely. BruceV.
-
-
FREE MEMBER
NO Posting or PM's Allowed
-
Legacy Member
why in hell would you even park that on any part of the foundation, knowing there was a sublevel to it, when that boom was long enough to reach any part of the site if parked on solid ground outside the foundation???
-
-
FREE MEMBER
NO Posting or PM's Allowed
It seems they received inadequate training in the use of the product.
-
Legacy Member
Somebody didn't do a hazard analysis on the job, or a proper pre-lift survey. I wouldn't want to be those guys.....
-
-
FREE MEMBER
NO Posting or PM's Allowed
If they had punched the proper load parameters in to the crane's "computer", I think it would have said "nope" as soon as they got the boom extended half way over that outrigger. Someone didn't do their pre-lift work.
-
FREE MEMBER
NO Posting or PM's Allowed
Having done a few precasts and on-site tilt-ups I understand why the rig was on the deck.
Timber pads may have helped spread the load, but there wasn't enough shoring against the pan deck. In the photos you can see a pair of shore jacks lying in the rubble. Having an outrigger taking the weight of the pick with no pads, not enough shoring, and in the center of a column bay on a fresh deck, is a recipe for disaster. If an old carpenter can see that, the operator certainly should have.
Call the rental company and tell them to come get it. LOL