Back in the '70s, there was a requirement for a new bridge near where I lived.
An LVT-4 was used to conduct the soil/bedrock survey before a new bridge was built alongside the original.
I was still at high school at the time; living not far from the northern end of the bridge.
With my trusty "Instamatic" in hand, I got a ride with my sister to watch the beast "do its thing". Then it drove up onto the beach at the Brighton (southern) end.
I managed to get permission from the operator to climb aboard and get some photos.
Here they are.
Attachment 49591Attachment 49592Attachment 49593Attachment 49594Attachment 49595Information
![]()
Warning: This is a relatively older thread
This discussion is older than 360 days. Some information contained in it may no longer be current.