+ Reply to Thread
Results 1 to 10 of 26

Thread: SMLE bolthead manufacturing process

Click here to increase the font size Click here to reduce the font size

Hybrid View

  1. #1
    FREE MEMBER
    NO Posting or PM's Allowed
    ssj's Avatar
    Join Date
    Jun 2013
    Last On
    11-13-2017 @ 01:21 PM
    Location
    New Zealand
    Posts
    651
    Local Date
    06-12-2025
    Local Time
    08:42 PM
    yeah they had "castle" turrets on the lathes....each side of 6? or 8? held a one tool job...
    Information
    Warning: This is a relatively older thread
    This discussion is older than 360 days. Some information contained in it may no longer be current.

  2. #2
    Advisory Panel

    jmoore's Avatar
    Join Date
    Mar 2009
    Last On
    06-09-2023 @ 04:20 AM
    Location
    US of A
    Posts
    7,066
    Local Date
    06-12-2025
    Local Time
    03:42 AM
    Quote Originally Posted by ssj View Post
    yeah they had "castle" turrets on the lathes....each side of 6? or 8? held a one tool job...

    That sort of thing is the father of CNC machinery. A general purpose piece of equipment which can be relatively easily retooled for different jobs.

    I'm thinking of machinery that is built expressly to do one operation on a specific part, or maybe a few operations at once. But not good for much of anything else except for the one part that it was built to process. When production is done, then the machine is usually scrapped or rendered down for components. The dedicated tooling/machinery could be fairly small and ganged with other tools in a small area. So what would now be normally done on one machine with multiple operations and "flexible tooling" (i.e. quick change), was done at a series of stations, each performing only a single task or two.

    Of course, there would be the usual lathes, turret lathes, various sorts of milling machines, drill presses, etc. which weren't special built, but did have assigned tooling for the production line.

    Somewhat in between the two types of equipment would be such things as rifling machines. Good for only one task, but capable of being converted to different bores and twists fairly easily and without permanent modification.

    Not quite on topic, but during the bulk of L-E production the machinery was usually remotely powered via overhead belting. So less cost there when changing out machines. Way higher maintenance requirements, though!
    Last edited by jmoore; 10-23-2013 at 03:12 AM.

  3. #3
    Advisory Panel breakeyp's Avatar
    Join Date
    Jul 2007
    Last On
    Yesterday @ 05:08 PM
    Location
    near Detroit Michigan
    Age
    78
    Posts
    971
    Real Name
    Paul Breakey
    Local Date
    06-12-2025
    Local Time
    03:42 AM
    I would think that the thread would have to start at the same place in the bolt body as well.

  4. Thank You to breakeyp For This Useful Post:


+ Reply to Thread

Similar Threads

  1. Bolthead number
    By Jugs in forum The Lee Enfield Knowledge Library Collectors Forum
    Replies: 4
    Last Post: 07-21-2012, 02:18 PM
  2. Lithgow FTR process
    By Capt.Mainwaring in forum The Lee Enfield Knowledge Library Collectors Forum
    Replies: 4
    Last Post: 02-27-2012, 11:04 AM
  3. Correct bolthead for 1941 Lithgow No. 1 Mk. III* SMLE?
    By rscaife in forum The Lee Enfield Knowledge Library Collectors Forum
    Replies: 10
    Last Post: 12-08-2011, 07:44 PM
  4. The process of restoring a SMLE No1 MkV .....
    By Badger in forum The Lee Enfield Knowledge Library Collectors Forum
    Replies: 1
    Last Post: 12-30-2010, 03:40 PM
  5. What to do about headspace after #4 bolthead?
    By Timmer in forum The Lee Enfield Knowledge Library Collectors Forum
    Replies: 40
    Last Post: 05-04-2009, 12:46 PM

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts